Utilize Figure 10.1 to track a construction system to the eighth level or below, but for a dairy construction project
Utilize Figure 10.1 to track a construction system to the eighth level or below, but for a dairy construction project and a different construction system than concrete, such as conveyors or process systems. What is the difference between lean construction and ABC?